Focused on exploration and growth on its 5 Lithium Lane Projects in Snow Lake Manitoba
Its projects are centrally located in the heart of North America, strategically located to supply North America’s growing demand for battery metals. Foremost’s Lithium Lane projects are located at the tip of the NAFTA “superhighway” with easy access to North American battery and EV manufacturing sites as well as to Europe via Port of Churchill.
39 confirmed spodumene pegmatite dykes and 30 follow-up drill targets moving into the "discovery" phase (drill)
39 spodumene pegmatite dykes with additional 30 follow-up targets (so far)
Located at the tip of the NAFTA “superhighway” with easy access to North American battery and EV manufacturing sites.
Adjacent with and comparable in scale and grade as Snow Lake Lithium’s project (11.0M tons at 1.00% Li2O) which just signed an MOU with LG Energy Solution